Description: B Raising and strengthening of Baharda T R E Saline Embankment Name of work Raising strengthening of Baharda T R E Saline Embankment
Details: Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm on pre measurement and removal of stumps of trees cut earlier disposal of unserviceable materials to be used or auctioned up to a lead of 1000 mtr including removal and disposal of top organic soil not exceeding 150 mm thickness with all leads, lifts and delifts with cost of all labour,T & P, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge. Earth work in excavation in all kinds of approved soil from approved borrow area by mechanical means with all leads, lifts and delifts including loading into the transportation vehicles and unloading from transported vehicles and depositing the same on properly prepared and scientifically approved surface including rough dressing and breaking the clods to maximum 5cm. to 7cm. ,laying in layers not exceeding 22.50cm including removal of roots, shrub jungles, bushes
Sector: Irrigation