Details: excavation in canal/drain by mechanical means in all kind of soil (this shall include sandy soil, ordinary soil, hard soil, gravelly soil, slushy soil, stony earth mixed with gravels, stiff heavy clay, hard shale, compact moorum, soling of road path, sand, silt etc.) in both wet & dry condition, trimming of & bed to design section including stump removal, shoring, strutting, propping bullahs, pilling, dewatering and removing the excavated materials with all leads and de-lift, etc and depositing the useful excavated materials in the embankment sections in layers not exceeding 22.50 cm. in depth breaking clods to maximum 5 cm to 7cm size and depositing the unsuitable earth in spoil bank or any other specified space loading into and unloading by mechanical means and transportation by transportation vehicle with all lead, lift and de-lift complete with hire & running charges of machineries, all costs for site illumination, mobilisation, demobilisation, construction of approach road &
Sector: Irrigation