Details: excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixed with boulder including dressing, levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, delifts, t & p required for the work, sundries, labour and labour cess etc.complete as per specification and direction of engineer-in-charge. filling foundation, plinth and below interlocking paverblock with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, t & p required for the work, sundries, labour and labour cess etc.complete as per specification and direction of engineer-in-charge. providing, laying, spreading and compacting grade ii stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming, crushab
Sector: Irrigation