Description: Development of internal road of town planning Scheme 3 Nuagoan TP 3 Name of Work Development of Internal Road of Town Planning Scheme 3 Nuagaon TP 3
Details: Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost and conveyance of all materials, labour, T&P, royalty and taxes etc. as required for the work complete as per direction of Engineer-in-charge. Loosening, levelling and compacting original ground supporting embankement to faciliate placement of first layer of embankement, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction & clause-305 of MOSRT&H Specifications for Road & Bridge works (5th Revision) including cost and conveyance of all materials, labour, T&P, royalty and ta
Sector: Urban Authority