Details: clearing shurb jungle uprooting stumps & small bushes and removal of up to a distance of 50 meters outside the periphery of the area as per the direction of the engineer-in-charge earth work in excavation of foundation in hard soil or gravelly soil within 50m initial lead and all lift including rough dressing and breaking clods to maximum 5cm to 7cm sizes and laying in layers not exceeding 0.30m in depth and as per the direction of the engineer-in-charge. filling in foundation and plinth with sand well watered and rammed including cost, carriage and royalty of sand etc. complete as per direction of engineer-in-charge. cement concrete m15 grade with crushed granite coarse aggregates of size 20 mm down graded of approved quality chips , mixing by concrete mixer ,placing by manual means and compaction through including all cost, conveyances,royalty and taxes of all materials ,curing etc. complete as directed by the engineer-in-charge. rigid and smooth centering and shuttering fo
Sector: Irrigation