Description: Construction of Road from RD 1990m to Basudevpur Chamakpur village Road and Balance work of HR and SHEP of Kanupur Irrigation Project Name of Work Construction of Road from RD 1990m to Basudevpur Chamakpur village Road and Balance work of HR SHEP of Kanupur Irrigation Project
Details: Flank dressing to proper camber all taxes etc complete all as directed by the Engineer-in- charge. Laying moorum/gravel in sub-base in uniform layers not exceeding 225mm watring & compactiong to the required density in O.M.C. With vibratory roller to achieve the desired density including all lead, lift, delift, cost of materials,royalty,taxes etc complete all as directed by the Engineer-in-charge. Excavation, loading,unloading and carriage by mechanical means of all kinds of soil,including stoney earth,gravel and moorum etc interspread with boulders upto 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1Km from the place of excavation complete. Earth work in foundation in hard compacted earth in the already constructed portion of the earth dam to proper section as per the approved design, d
Sector: Irrigation