Details: earthwork in excavation of foundation in hard soil or gravelly soil within in 50 m initial lead and 1.5 m initial lift including rough dressing breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & making fit for foundation with all labour, t&p etc. complete as per the direction of the engineer in charge. supplying & filling foundation trenches , plinth & ditches with clean coarse river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking, royalties and all cost & conveyance of water, cost of all labour,labour ess,t&p required for the work etc. complete in all respect as directed by the engineer- in -charge. providing cement concrete with m-15 grade using 40mm and down graded crusher broken hard granite coarse aggregates of approved quality, free from weathered skin surface and foreign materials, mixed by concrete mixer and placing mannually or mechanical
Sector: Irrigation