Details: earth work in excavation of foundation in hard soil with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at place away from work site with all leads and lifts including cost, all labour, cess t&p articles required for the work etc. complete as per specification and direction of the engineer-in-charge. supplying filling in foundation and plinth with fine course sand in 23.5 cm (9") thick layers free from organic and materials, well watered and rammed including all cost conveyance, royalty taxes and all labour t&p & cess articles required for the work etc. complete as per the specification and direction of the engineer-in-charge. providing c.c.(1:3:6) in foundation and plinth using 4cm size hard hand broken granite metal including mixing ,hoisting, lowering, laying and compacting concrete in layers of specific thickness including centering shuttering and finished the exposed surface smooth providing beads where necessary includi
Sector: RDPR