Details: civil works earthwork in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 in volume within 50m. initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department. supplying and filling in foundation with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with t&p required for the work etc. complete as per specification & direction of engineer-in-charge providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in eac
Sector: PWD