Description: Construction of ASCO Office at Semiliguda Dist Koraput Name of Work Construction of A S C O office at Semiliguda Koraput
Details: Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead Dismentling and removing 2.5 cm thick A.S flooring etc Dismantling G.C.I or A.C sheet roofing after careful removal of bolts and nunts including stacking of the the matelials for reuse and removing the debris within 50mt. Lead etc. Dismantling and removing doors,windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse andremoving the debris within 50m lead Earth work in excavation of foundation in all kinds of soil including moorum, stony earth mixed with boulders (except sheet rocks and boulders requiring blasting) with all leads and lift. Supplying, filling in foundation and plinth with sand in 22.5 cm (9”) thick layers including watering and ramming C.C.(1:4:8) with 40mm size cbhg metal in F&P including all costs, carriage, royality and curing etc al
Sector: Irrigation