Description: Construction of Compound Wall and Office Godown at Phulbani Dist Kandhamal Name of Work CONSTRUCTION OF COMPOUND WALL AND OFFICE GODOWN AT PHULBANI DIST KANDHAMAL
Details: Earth work excavation of foundation in hard soil or gravelly soil within 50m. Initial led and 1.5m initial lift including rough dresing and levelling the bed and depositing the excaveted earth away from site and as per the direction of the Engineer-In-Charge. Filling Foundation and plinth with sand including cost, conveyance, royality etc complete Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete Fly ash Brick Masonery in C.M ( 1:6) in F&Pwith cost, conveyance, royality etc complete for wall. Fly ash Brick Masonery in C.M ( 1:6) in S/Swith cost, conveyance, royality etc complete R.C.C work ( 1:1.5:3) with 12 mm size chips including cost, conveyance etc complete Column Footing (M20) Column (M20) Plinth Band (M20) Lintel (M20) Roof Beam (M20) Chhaja (M20) Roof Slab (M20) Cutting bending and binding of M.S or Tor rod and tying the Grills etc complete 16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:4) over wor
Sector: Sericulture