Description: Const of Twin F type Quarter for Peon RW Divn No II Keonjhar for 2023 24 Name of Work Construction of Twin F Type Quarter for Peon R W Division II Keonjhar for the year 2023 24 Ground Floor
Details: Earth work excavation in foundation in Hard of soil including hard moorum, stoney earth mixed with boulders ( except sheet rocks and boulders requiring blasting) with all leads and lifts including rough dressing the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P required for the work complete as per direction of the Engineer-in-charge. (Ground Floor) Construction of embankment with approved materials obtained from borrow pits with all lifts and leads,transporting to site by mechanical means within a lead of 5 kms,spreading and grading to required and compacting meet requirement of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. (Ground Floor) Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required
Sector: RDPR