Description: Construction of CC approach road for 3x1000MT godown at Jeypore Name of work Construction of CC Approach road for 3x1000MT godown at Jeypore
Details: Earth work excavation in hard or gravelly soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and leveling the bed. C.C (1:2:4)with 12mm size HG chips including all cost, conveyance,royalty & taxes etc.comp.to work site as per the specification approved by the department & direction of E.I.C. Providing M.S reinforcement for RCC work including cutting, bending, binding & tying the grills and placing in position including cost of binding wire 18 to 20 gauge as per drawing & technical specification. Supplying all materials and labour for laying sub-base in layers not exceeding 100mm thick watering & compaction to be required density in Sub-base with stone dust.(Crusher dust) Providing, laying, spreading, and compacting stone agreegate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 8-10 tones PRR to proper grade and camber, applying and brooming requisite type of screening / binding
Sector: Cooperative Federation