Description: Shifting and Installation of High Mast Lighting Towers inside and outside the Port prohibited area Name of Work Shifting and Installation of High Mast Lighting Towers inside outside the Port prohibited area
Details: (A) Supply Part : Supply of 3.5 C x 300 sq mm, 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable. Supply of 3.5 C x 120 sq mm, 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable. Supply of 3.5 C x 70 sq mm, 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable. Supply of 3.5 C x 50 sq mm, 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable. Supply of 4 C x 25 sq mm, 1.1KV grade G.I armoured XLPE insulated stranded aluminium conductor cable. Supply of 400 Amp. Outdoor type Feeder Pillar. Supply of 250 Amp. Outdoor type Feeder Pillar. (B) Execution Part : Dismantling of High Mast Lighting Towers as per the Scope of Work. Execution of foundation for High Mast Lighting Tower with supply of required HT steel foundation bolts along with nuts, washers,anchor plate, templates & civil materials as per the Scope of Work. Shifting of High Mast Lighting Tower from inside Port Prohibited area to proposed ar
Sector: Harbor