Description: CONSTRUCTION OF COMPOUND WALL ARROUND 132 33 KV GRID SUB STATION AT MANCHESWAR Name of Work CONSTRUCTION OF COMPOUND WALL ARROUND 132 33 KV GRID SUB STATION AT MANCHESWAR
Details: Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement. of approved quality and dimensionincluding cost, conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in Chage. Supplying all labour for dismantling brick or stone masonry including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge Earthwork in excavation in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceedng 0.3 m in depth on foundation trenches including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and s
Sector: Transmission