Description: Repair of ASCO office building at Raikia Dist Kandhamal Name of Work Repair of ASCO office building at Raikia Dist Kandhamal
Details: 12mm thick cement plaster (1:6) over brick with cost, coveyance, royality & taxses of all materials. Planting two coats with any approved colour Weather coat over Building outer Earth work in hard soil within all initial lead & liftincluding rough dressing & breaking clods etc. vide A/R page2 item no 2(a) Filling sand in F& P watered with all labour, Cost of Sand,T&P etc complete. C.C.(1:4:8}) with 4cm size c.b.h.g.metal in F&P with cost,coveyance & royality etc C.C.(1:2:4) with 12mm size c.b.h.g.chips in F&P with cost,coveyance & royality etc Flyash.Brick Masonry 10" in cement mortar (1:6) in Foundation with cost ,coveyance,royality& taxes of all materials Flyash.Brick Masonry 10" in cement mortar (1:6) in superstructure with cost ,coveyance,royality& taxes of all materials 16mm thick cement plaster (1:6) over brick workwith cost ,coveyance,royality& taxes of all materials. 12mm thick cement plaster (1:6) over brick with cost ,coveyance,royality& taxes of all materials. Priming
Sector: Irrigation