Description: Construction of Office Building For A S C O Chakapad Dist Kandhamal Name of Work Construction of Office Building For A S C O Chakapad Dist Kandhamal
Details: Civil Cost Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. C.C.(1:4:8) with 40 mm. size h.g. metal in F&P. Brick work with FLY ASH bricks inC.M(1:6) in foundation and plinth R. R. H.G. stone masonry in C.M. (1: 6) in foundation and plinth works Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-Charge. (a) Column Foundation (b) Plinth Band (c) Lintel Ground Floor (d) Column above Plinth (e) Roof Beam (f) Sun Shade and Chajja (g) Roof (h) Stair case (a) Column above Roof (b) Sun Shade and Chajja (c) Staircase Roof Supplying,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and techenical specification.for Ground Floor Supplying,fitting and placing uncoated HYSD ba
Sector: Irrigation