Description: RAISING OF EXISTING BITUMEN ROAD INSIDE BALIJHARA WATER WORKS AND APPROACH TO RAW WATER 2 Name of Work Raising of existing bitumen road inside Balijhara Water Works and Approach to Raw Water II
Details: Scarifying bituminous road surface upto 50 mm depth by mechanical means and disposal of dismantled materials up to a lead of 1000 metres or at identified location, stacking serviceable and unserviceable materials separately including all labour, machineries, materials, T&P, fuel, hire and running charges of all machineries ,taxes excluding GST, etc. all complete as directed by Engineer-In-charge. Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground including all labour, machineries, materials, T&P, fuel, hire and running charges of all machineries ,taxes excluding GST, etc. all complete as directed by Engineer-In-charge. Providing & laying quarry dust of aprroved as sub-base in layers not exceeding 225mm thick each watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material, labour, transporation, h
Sector: Harbor