Description: Construction of distribution system for 10671 Ha Of CCA including Command Area Development CAD for 10671 Ha of CCA of Salandi Left Main Canal from RD 30 547 Km to 45 570 Km through Under Ground Pipe Line Irrigation Name of Work Construction of distribution system for 10671 Ha Of CCA including Command Area Development CAD for 10671 Ha of CCA of Salandi Left Main Canal from RD 30 547 Km to 45 570 Km through Under Ground Pipe Line Irrigation System Gravity Flow of Anandapur Barrage Project in Balasore district of Odisha on EPC Turn Key basis including operation and maintenance of complete commissioned project for five years
Details: Execution of canal distribution network including Command Area Development (CAD) works up to 1 hectare chalk for Salandi Left Main Canal system from RD 30.547 Km to 45.570 Km of Anandapur Barrage Project through Under Ground Pipe Line System (Gravity Flow) for CCA of 10671 Ha on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical BidDocument and guidelines of CWC, Govt. of India. Execution of Micro Irrigation System for 1067 Ha within the total CCA of 10671 Ha of Salandi Left Main Canal system from RD 30.547 Km to 45.570 Km of Anandapur Barrage Project through Under Ground Pipe Line Systemon "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical BidDocument and guidelines of CWC, Govt. of India. Operation &Maintenance
Sector: Irrigation