Description: Rectification of accident prone Black spot of NH 26 from Km 72 00 to 130 280 Km by Improving Road Safety through Improvement of Junctions and Implementing Permanent Measures under Road Safety Annual Plan for the year 2022 23 Name of Work Rectification of accident prone Black spot of NH 26 from Km 72 00 to 130 280 Km by Improving Road Safety through Improvement of Junctions Implementing Permanent Measures under Road Safety Annual Plan for the year 2022 23
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Sand Filling in Foundation Trenches as per Drawing & Technical Specification Cement concrete M 15 Levelling coarse with 40 mm size C.B. Metal of approved quality as per approved drawing and direction of the Engineer-in-charge including cost, conveyance, royality taxes of all materials conforming to the MO
Sector: Road development