Description: E C and testing of Barrage Bay and U Sluice vertical fixed wheel gates with their hoisting arrangements hoist supporting structure and trestles stop logs lifting beam to operate stop logs monorail supporting structure etc of Kusumi Barrage Pr Name of Work commissioning and testing of Barrage Bay and Under Sluice vertical fixed wheel gates with their hoisting arrangements hoist supporting structure and trestles stop logs lifting beam to operate stop logs monorail supporting structure and walkway for operation of monorail for Kusumi Barrage Project under Nayagarh Irrigation Division
Details: Barrage Bay vertical fixed wheel gates alongwith rope drum hoisting arrangements, hoist supporting structure & trestle, Gate size:9000 mm x 3500 mm, No of sets : 06 of 1st stage embedded parts of 2nd stage embedded parts for Barrage Bay vertical fixed wheel gates of size: 9000 mm x 3500 mm. (06Nos) . of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) . including light test for proper sealing. Painting of Barrage Bay vertical fixed wheel gates of size: 9000mm x 3500mm. (06Nos) “after blast cleaning process, performed with sand as per requirements and class ‘A’ of IS14177:1994. After blast cleaning, the surface should be cleaned from loose dust and debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer should be applied to give a total dry film thickness of 70 ± 5 microns followed by two coats of solvent less black Epoxy Paint applied at an interval of 24 hours between each coat. Each coat should give a mi
Sector: Infrastructure