Description: Construction of A S C O Office Sonepur Sonepur Name of Work Construction of A S C O Office Sonepur Sonepur
Details: Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. C.C.(1:4:8) with 4 c.m. size h.g. metal in F&P. Cement Concrete(1:2:4)with 12 mm size Hard Granite chips (Crusher broken) Brick work with FLY ASH bricks inC.M(1:6) in foundation and plinth R. R. H.G. stone masonry in C.M. (1: 6) in foundation and plinth works Filling in foundation and plinth with excavated materials including watering and ramming Brick work with FLY ASH bricks inC.M(1:6) in Super structure in Ground Floor Brick work with FLY ASH bricks inC.M(1:6) in Super structure 1st Floor RCC Work M-20 grade with 20 mm and down grade HG chips (CB) including hoisting,lowering & laying concrete and compacting by using ramming for ground floor Column base, frustum, plinth band Lintel Column and beam Sun shade,
Sector: Irrigation