Description: commissiong testing and paintaing of 06 sets of barrage bay and 02 sets of under sluice vertical gates with 2nd stage embedded parts 14T hoist and its supporting structure and 2nd stage concreting of Saptamatruka Barrage Project Name of Work Commissioning Testing of 06 six sets of Barrage Bay vertical fixed wheel Gates of size 8000mm x 2800mm with 2nd Stage Embedded Parts 14 T hoists and 02 two sets of Under sluice vertical fixed wheel Gates of size 8000mm x 3300mm with 2nd Stage Embedded Parts 14 T hoists Hoist supporting structures Trestles Stoplogs Monorail Supporting structure walkway for operation of Monorail Painting 2nd stage concreting of Saptamatruka barrage Right Arm as per approved drawings pertaining to Saptamatruka Barrage project and direction of the Engineer in Charge
Details: BARRAGE BAY GATES of 1 st stage & 2nd Stage Embedded Parts for 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm , Commissioning, Testing of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm , Commissioning, Testing of 06(six) sets of 14 T rope drum hoist for 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm , Commissioning, Testing of Trestles & hoist supporting Structures for 06(six) sets of 14 T rope drum hoist 2nd stage concreting of embedded parts of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm including hoist supporting structures & trestles by M25 grade concrete using 20mm and down grade agregates. Painting of 06(six) sets of Barrage Bay Gates of size 8000mm x 2800mm after blast cleaning process performed with as per requirements & class 'A' of IS 14177: 1994. After blast cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich
Sector: Infrastructure