Description: Supply of Chemical--Name of Work: Construction of bridge over Samakoi river at 1st Km. on Danduamunda to Kamalanga road (PS) road under DMF in the District of Keonjhar.
Details: Earth work in excavation of in all kinds of soil with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of Engineer-in-charge. Labour of sinking single circular well caission/ cribwell of specified external diameter in all kinds of soil to lines levels & plumb by scooping out from inside the well & below the steining including cost of dredging & plants ,supply & work of pumps, dredgers & compressors, derrick, winches, cranes etc. balling out of water & dredging, removing all materials & obstacles from inside the wells inclusive of hire & running charges of all such machinery including materials & labour charges for providing kentledge loading if necessary & sinking to the required depth by loading with proper designed & preapproved weight & taking precautions ade
Sector: Forest and Environment