The has published a tender for "R.I Office Res at Kuluma" on the 28 Jan 2026. This tender belongs to Office and Accommodation category. The vendors interested in this tender and related Office and Accommodation tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related categories: Clock Tower Tenders | Camera Tower Construction Tenders | Prefab Office Tenders |
| Tender Title | R.I Office Res at Kuluma |
|---|---|
| Tender Description | earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge. supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, t&p required for the work etc. complete in all respect as per direction by the engineer in charge. cement concrete 1:4:8 using 4cm size hg metal including cost of all materials labour t&p etc complete. providing c.c. (1:2:4) using 12mm size hard granite crusher broken chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction |
| Comments | earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge. supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, t&p required for the work etc. complete in all respect as per direction by the engineer in charge. cement concrete 1:4:8 using 4cm size hg metal including cost of all materials labour t&p etc complete. providing c.c. (1:2:4) using 12mm size hard granite crusher broken chips including all cost carriage royality taxes and all labour involved for the completion of item of work as per direction |
| Published Date | |
|---|---|
| Due Date | 02 Feb 2026 00:00:00 |
| Estimated Value | 3.37 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |