Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per direction and specification of engineer in charge. providing and applying tack coat on prepared bituminous surface with bitumen emulsion (repaid setting) at the rate of 0.20 kg per sqm. using bitumen emulsion pressure distributor after cleaning the surface etc. complete as per the direction of the engineer-in-charge inlcudng cost conveyance royalty and taxes of all taxes of all tollages of all materials and hire & running charges of all machneries cost of labour and t&p required of the work etc complete. providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified
Sector: PWD