Details: earthwork in excavation of foundation in slushy soil in water up to 0.6 mtr. depth (requiring the aid of pans and vessels) from canal bed with all leads, lifts & delifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 mtr. in depth with all labour t & p etc. complete and depositing the excavated materials clear away from work site inclding all taxes, cess, labour and t & p etc. all complete as per the direction of engineer-in-charge. (measurement will be taken in level section only) clearing of thickly grown water hyacinth or weeds from canals and drainage channels including all labour, t & p and depositing the same away from the site with all lead, lift, delift & rehandling including all taxes, cess etc. all complete as per the direction of engineer-in-charge.
Sector: Irrigation