Details: clearing grass and removal of up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of engineer -in –charge. labour for laying sub base in layers not exceeding 225 mm watering & compacting to the required density in o.m.c with vibratory roller including cost, conveyance, royality of all materials etc complete as per direction of engineer-in-charge providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam(wbm) with stone screening specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, crushable screening(morum and sand admixture) to fill-up the interst
Sector: RDPR