Description: maintenance work Name of Work Desilting to Daya West Branch Canal from RD 00 Km to 7 50 Km
Details: Earthwork in excavation of foundation in slushy soil in water up to 0.6 mtr. Depth (requiring the aid of pans and vessels) from canal bed with all leads, lifts & delifts including rough dressing and breaking clods to maximum 5Cm to 7Cm and laying in layers not exceeding 0.30 mtr. in depth with all labour T & P etc. complete and depositing the excavated materials clear away from work site inclding all taxes, cess, labour and T & P etc. all complete as per the direction of Engineer-in-Charge. (Measurement will be taken in level section only) Clearing of thickly grown water hyacinth or weeds from canals and drainage channels including all labour, T & P and depositing the same away from the site with all lead, lift, delift & rehandling including all taxes, cess etc. all complete as per the direction of Engineer-in-Charge.
Sector: Irrigation