Details: earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge. supplying all labour, t&p, for laying in trenches high density polythene pipes and specials of following outside diameter and class 1 to 3 jointing by fusion welding method including testing as per specification confirming to is: 4984-1995 with isi marked specials & fittings & testing as per specification etc. complete as per the direction of engineer-in-charge. (pipes are to be supplied by contractor with pre & post delivery inspection certificate from cipet and manufacturing test certificate from the manufacture) filling in foun
Sector: Irrigation