Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees in area of light jungles upto 300mm girth, removal of stumps of trees cut earlier, disposal of unserviceable materials and debris away from the work site and stacking of serviceable materials to be used or auctioned up including removal and disposal of top organic soil not exceeding 150mm in thickness with all leads, lifts and delifts, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the
Sector: Irrigation