Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees in area of light jungles upto 300mm girth, removal of stumps of trees cut earlier, disposal of unserviceable materials and debris away from the work site and stacking of serviceable materials to be used or auctioned up including removal and disposal of top organic soil not exceeding 150mm in thickness with all leads, lifts and delifts, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge earth work in excavation in hard soil in approved borrow area by mechanical means, loading into and transportation of the excavated materials by mechanical means and depositing them in filling reaches of canals on properly prepared and scientifically approved surface to the required section including breaking clods to maximum 5cm to 7cm size and laying in layers not exceeding 0.3m in depth, spreading and levelling with all leads, lift
Sector: Irrigation