Details: clearing shrub jungles uprooting stumps and small bushes and trees below 1 m grith on premeasurement with all leads, lifts and delifts, labour t&p, cess etc complete as per the direction of the engineer-in-charge. earth work in all kinds of soil with 50m intial lead and 1.50m intial lift including rough dressing and levelling the bed and deposting the excavated earth away from work site and breaking the clods to maximum 5 cm to 7cm size and laying in layers not exceeding 0.30 m in depth including labour, t&p, cess etc complete as per the direction of the engineer- in- charge. puddle filling in good clay with all leads, lifts, delifts including digging, weathering, pulverising and trodding with all labour, t&p and cess etc complete as per direction of engineer-in-charge.
Sector: Irrigation