Description: Construction of Additional Classroom at Nuaguda A C PS Name of Work Construction of Additional Classroom at Nuaguda AC PS
Details: Earthwork in excavation of foundation in all kinds of soil within 50 mtrs initial lead and 1.5 mtrs initial lift including levelling and dressing the bed etc. complete Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC. P. C. C ( 1: 3:6)) to using 40mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC. P. C. C ( 1: 3:6)) to using 40mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC. R.C.C M-20 for column base & Plinth beam using 12mm size BHG chips including centring , shuttering etc. cost, conveyance of all material and labour etc complete as per the direction of EIC. Column base Column up to plinth Grade beam R.C.C M-20 for Lintel Band & Door window sill band using 12mm size BHG chips including centring , shuttering etc. cost, conveyance of all materia
Sector: Water supply and Sewerage