Details: cleaning shrub jungles uprooting stumps and small bushes and trees below 1.00 mtr girth including all labour, t&p, sundries and labour cess etc. complete and as per the direction of engineer-in-charge. earth work in stoney earth and gravel mixed with stone and boulder not exceeding 0.014 in volume within 50m initial lead & 1.50m intial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost of all labour, t&p, sundries and labour cess etc complete and as per direction of engineer-in-charge.
Sector: Generation