Details: cost of other materials for line and sub-station:-accessories for 11/0.4 kv dp strucutre of 250 kva plinth mounted s/s on 11 mtr. joist pole with double disc arrangement and 5 nos. of earthing in no.4 gi wire, 1 no. gi flat earthing for neutral along with lt distribution box with mccb arrangement (except cost of pole) including 1% labour cess, t&p @2%, transportation @7.5% & charges @10%. 11 kv line on 11 mtr. long joist pole with 100 mm2 aaac conductor with pin point and 2 nos double pole cut point with double disc arrangement (except cost of pole) including 1% labour cess, t&p @2%, transportation @7.5% & charges @10%. 11 kv dp on 11 mtr. joist pole with accessories (excluding cost of pole) including 1% labour cess, t&p @2%, transportation @7.5% & charges @10%. 11 kv dp on 11 mtr. joist pole with ab switch (400 amp. 3 pole, 50 hz type) and accessories (excluding cost of pole) including 1% labour cess, t&p @2%, transportation @7.5% & charges @10%. 11 kv dp on 11 mtr. joist pole
Sector: PWD