Details: earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & t&p required for the work complete including cost of all labour,labour cess,t&p,sundries etc. as directed by the engineer in charge. filling in foundation trenches and plinth with excavated earth including laying the earth in layer not exceeding 23.5cm thick ramming & watering with all leads & lifts including cost of labour t&p required for the work etc. complete as per specification and direction of the engineer-in-charge. supplying and filling in foundation & plinth with sand in 23.5 cm (9") thick layers including watering and ramming with cost, conveyance, royality taxes of all materials, and labour with t&p required for the work including cess etc complete. (measurement will be taken on finished compacted section onl
Sector: RDPR