Details: resectioning of dam of agulabandha mip at lathipada in sorada block clearing shrub jungles uprooting stumps and small bushes and trees below 1m girth on premeasurement with including cess etc. complete in all respect as per specification and direction of the engineer-in-charge. excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stoney earth, gravel and moorum etc interspread with boulders upto 0.50 size with all leads and lifts and delifts, including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specifcation etc. complete as per direction of engineer-in charge. excavation of the approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within 1 km lead on properly prepared and scientifically approved surface including spreading & levelling the earth in 22.5cm layers to make ready for water
Sector: Infrastructure