Details: earth work in excavation of foundation trenches in hard soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, t&p labour required for the work etc. complete as directed by the engineer-in charge. cement concrete (1:3:6) in foundation and plinth using 4 cm. size hard granite crusher broken metal of approved quarry and approved quality including hoisting lowering laying concrete in layers not exceeding 0.15 m. in depth including compacting watering and curing etc, complete including cost ,conveyance, royalities & of all materials and cost of labour etc with t&p required for the work etc. complete as per specification & direction of engineer-in-charge. rcc work m-20 having a minimum compressive strength 200kgs/cm2 in 15cm.cubes at 28 days after mixing and tests conducted in accordance with is.456 and is.516 using 12mm.to 20mm. size black hard crusher broken granite stone chips of appr
Sector: PWD