Details: earth work in all kinds of soil within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3mtr in depth as per direction of engineer-in-charge. cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department including stacking the useful materials separately as ordered etc as per direction of engineer - in - charge. supplying all materials, labour and t&p for filling approved sand of specified quality under floors, in foundations, plinths, etc. for all depths and heights including cost of sand, royalties, transportation to site for all leads and lifts,including loading, unloading, spreading in layers all complete as per drawings, specifications and direction of engineer-incharge. cement concrete (1:3:6) using 4
Sector: Water supply and Sewerage