Details: e/work excavation of foundation in hard soil within initial lead of 50m and initial lift of 1.50m including rough dressing and levelling the bed of foundation etc all complete. filling of foundation and plinth with sand with well watered and rammed including of all cost complete. cement concrete (1:3:6) using 40mm size hg meteal including of all cost complete. (r.c.c. work in m-20 grade concrete using 20mm and down graded sigh hg chips including of all cost complete.a) column base upto plinth (b) column & beam (c) plinth beam (d) lintel band (e) chajja and slab (f) stair case fly ash brick masonry with cm (1:6) in foundation and plinth including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (t&p) etc. complete as per the direction of engineer-in-charge. fly ash brick masonry with cm (1:6) in superstructure including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (t&p) etc. complete as per the direction of engine
Sector: Water supply and Sewerage