Details: cleaning the exist bt surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous including cost of all materials and labour and t&p complete providing and applying tack coat with bitumen emulsion pressure disributer at the rate of 0.20 kg per sqm on the prepared bituminous surface as per mo srt & h specification including all cost of material and labour etc. complete providing and laying seme dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 grade of bitumen transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheelede vidratory and tandem rollers to achievethe desired compaction as per clause 508 of mosrt&h specfica
Sector: PWD