Details: earth work in excavation of foundation in hard soil within initial lead and 1.5m lift including rough dressing and levelling of foundation bed and depositing the soil away from the work side including cost of labour, t & p, dewatering for the work etc. complete & as per the directoin of e.i.c. providing supplying,filling in foundation and plinth with sand, well watered and rammed with cost, conveyance & royalty of materials with labour and t&p required for the work etc.complete (measurement will be taken on finished completed section only) as per direction of e.i.c. cement concret proportion (1:3:6) using 4cm, size b.h.g.c.b metal of approved quality from approved quarry including lowering, laying concrete, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm.thick including cost, conveyance royalties and taxes of all materials and labour with t & p required for the work etc. complete as per direction of eic rcc m-20 grade with crushed granite 20mm
Sector: Water supply and Sewerage