Details: earth work in hard soil 50m initial lead & 1.5 m initial lift including rough dressing & breaking of clods to minimum 5 cm to 7 cm and laying in layers not exceeding 0.30m (1’-0”) in depth including cost of all t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. earth work in excavation of foundation in hard soil within 50 m initial lead & 1.5 m initial lift including dressing & levelling the bed & depositing excavated materials within above lead & lift including cost of all t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. filling in f&p with excavated materials including well watered and rammed including cost of all t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. filling in f & p with sand well watered and rammedincluding cost of all materia