Details: dismantling and removing rcc columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of labour with t&p required for the work etc. complete as per direction of engineer-in-charge. earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed and depositing the excavated earth within initial lead of 50m and shoring, shuttering, dewatering etc. including labour cess etc. complete as per the direction of the engineer-in-charge. filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess and all taxes etc. complete as directed by the engineer-in-charge. providing and laying cement concrete m-15 with 40mm size down graded coarse aggregates of approved quality mixing by concrete mixure and placing manually, compacting with including hire and running char
Sector: Medical Education