Details: earth work in ordinary soil within 50 m initial lead and 1.5m initial lift including rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers to not exceeding 0.3m in depth and as per direction of the department. 08 earth work excavation in foundation in oridinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the eic. 09 providing spreading, filling in foundation and plinth with sand watered and rammed as per opwd specification including cost of materials, labour, conveyance, royalty, tools and plants etc.all complete required for the work to finished items of work. 18 pcc (1:3:6) with 40 mm size hg metal including all cost of materials, labour, conveyance, royalty, t&p, water for curing etc all complete. 37 blinding road surface with crusher dust including cost and conveyance of materials t&p etc 221 providing, laying,
Sector: Municipality