Details: earthwork in excavation of over burden soil for bridge works in all kinds of soil by mechanical means and utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications section 900 and clause 301 & 304 of mort&h specifications for road & bridge works (5th revision) & including cost of all labour, t&p, royalty etc complete and as per direction of the engineer-in-charge. earth work in excavation of in hard soil in foundation with initial lead and lift including dressing the sides & leveling the bed of the foundation to the required width & required depth including dewatering if necessary and stacking the excavated materials away from working area etc.complete and as per specification and direction of engineer -in –charge. providing plain cement concrete (1:3:6) mix with crushed stone aggregate of 4cm nominal size m
Sector: RDPR