Details: tala pathapur-i:earth work in excavation of foundation in hard soil within 50 m initial lead & 1.5 m initial lift including dressing & levelling the bed & depositing excavated materials within above lead & lift including cost of all t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. filling in f&p with excavated materials including well watered and rammed including cost of all t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. filling in f & p with sand well watered and rammedincluding cost of all materials, t&p required for the work, cost of transportation, cess, royalty etc complete except gst as per instruction of engineer-in-charge. cement concrete (1:4:8) with 4cm (1½”) size hard granite metal c.b. metal of approved quality from approved quarry with required ramming,watering and curring etc. complete including cost, roy
Sector: Irrigation