Details: earth excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of engineer. supply fillimg sand in f & p including cost, conveyance & royalty od sand cost of all labour cess, watering, raming etc cement concrete (1:3:6) using 4cm size b.h.g. (c. b.) metal including cost, conveyance , royalty & taxes of all materials etc. complete cement concrete (1:2:4) using 12mm size b.h.g. (c. b.) chips including cost, conveyance , royalty & taxes of all materials etc. complete rigid & smooth centering & shuttering for c.c.works including dismantling for reuse after casting etc. complete. providing, and laying 80mm thick factory made cement concrete interlocking paver block of m-40 grade made by block making machine with strong vibratory compaction of approved size design and shape laid in requiered colour and patytern over and including 50 mm thick compacted bed of coarse sand filling the
Sector: Municipality