Details: earth work in excavation by mechanical means in d.i rock, laterite and soft rock not requiring blasting inter spread with boulders up to 1/2cum size with all lifts and delifts including trimming of slopes and bed to design section which may be quarried of split with crow bars and disposal of excavated material clear of work site by mechanical means and unloading the same on specified approved area with all leads, lifts and delifts including cost of dewatering, cost component of construction and maintenance of coffer dam, diversion arrangement for excess flow and dismantling of the same after completion of work including cost of mobilisation, demobilisation, tools & plants, all material, all taxes, cess labour and supervision charges, supplying all machineries and equipments with operation and maintenance charges with all incidental charges to complete the item of work as per design, drawing & specification and as per the direction of the engineer -in-charge.(measurement will be taken
Sector: Irrigation